Spraying startedThe spraying of butyrate has started. The elevator and stabiliser were first wet sanded down and then three coats of butyrate are to be...
Duct updateThe thrust duct has been cnc cut into 6 slices and glued together with wood glue. It was then sanded down and is ready for fibreglassing.
Wing covering completedBoth wings are now finished with the covering process and had their tapes applied. The tapes were doped on with nitrate and serve to...
Second wing under waySecond wing covering is underway. A reinforcement strut was added to prevent the warpage of the root and tip rib near the trailing edge...
Wing covering cont.Bottom surface glued, shrunk and nitrate doped successfully. Bad news however as shrinking caused warpage of root and tip ribs near the...
Fan and engine placementThrust fan delivered from Wingfan. Engine placement in frame. Engine is rotated to run in upside down position to accommodate aft wing...